Water Storage Infrastructure for Kericho County
To address the chronic water scarcity in Gasheen, Kamasian Ward, our firm provided the engineering and implementation for a transformative water project. This initiative delivers a sustainable water source previously unavailable to the community.
Client: County Government of Kericho & Counternine Ltd
Location: Gasheen, Kamasian Ward, Kipkelion West Constituency, Kericho County
Timeline: Completed January 2023
📌 Background
In line with the County Government of Kericho’s vision to enhance water access and strengthen food security, Champion Engineering Ltd was contracted through Counternine Ltd to deliver a sustainable and large-scale water storage solution.
The project focused on Gasheen in Kamasian Ward, Kipkelion West Constituency, a region where communities have long faced water scarcity for both domestic and agricultural use. This initiative sought to transform lives by harnessing water for daily needs, irrigation, and long-term economic empowerment.

🛠️ Scope of Work
Design, Supply & Installation of Pressed Steel Tanks
- Champion Engineering Ltd designed, supplied, and installed three pressed steel panel water tanks, each with a 200,000-litre capacity.
- The tanks were distributed across three different sites within Gasheen, ensuring widespread coverage and accessibility.
- The pressed steel panel design allowed for efficient assembly, durability, and long service life in diverse weather conditions.
Civil Works & Structural Foundations
- Each tank was mounted on reinforced concrete foundations, engineered to support the significant water load.
- Groundworks and soil stabilization were carried out to guarantee safety, stability, and long-term resilience.
Integration with Distribution Networks
- The tanks were linked to piping and distribution systems, ensuring water could be conveyed effectively to homes, farms, and community facilities.
- The system was designed for dual use: domestic consumption and smallholder irrigation.






🌍 Community Impact
This investment represents a milestone for water infrastructure in Kericho County:
- Improved Domestic Supply: Thousands of households now have access to safe and reliable water.
- Boost to Agriculture: Irrigation support has enhanced crop yields and livestock farming, directly contributing to food security.
- Economic Benefits: Increased agricultural productivity has provided families with improved household incomes.
- Sustainable Growth: By reducing dependency on rainfall, the project strengthens climate resilience and long-term sustainability.
📊 Project Highlights
- 3 Steel Tanks Installed (200,000 litres each)
- Total Capacity: 600,000 litres
- Three Strategic Locations across Gasheen, Kamasian Ward
- Completion Date: January 2023
- Beneficiaries: Households, schools, farmers, and local institutions in Kipkelion West Constituency
✨ This project showcases Champion Engineering Ltd’s expertise in delivering high-capacity water storage systems in partnership with governments and engineering contractors — creating a lasting impact on communities, agriculture, and livelihoods.
| GET QUOTATION TODAY!
Let's Be of Help Today!
We are experts in water, steel structures fabrication, solar systems supply, and fencing & boundary deterrent solutions, installation and maintenance! Reach out and get your problems resolved professionally and affordably by Champion Engineering.